Flexible in Budgeting By Stage Capturing CAPEX and OPEX
The budgets can be adjusted for each stage of the project (Concept, Preliminary Planning, Detailed Planning, Tendering, and Post Tendering). Cost calculation and control is comprehensive to capture both CAPEX and OPEX which include the cost of goods X-Factory, the cost of freight and customs independently, warranty cost, the cost of assets that are standard options as well as the cost of consumables and disposable.
Immediate Identification of Items Status
Because of the way the Pequip program is design and the relationships created between multiple tables covering all stages of the project, identifying the status of a particular item, multiple items, or rooms on a given date is now possible on a live portal as well as on queries that can be printed.
Built-In Comprehensive Document Control System
Pequip has a built in document management system that covers different stages of the project. Utilities include managing minutes of meetings to creating actions that must be implemented by the planners; tracking all changes in the planning and design drawings; initiating documents transmittals via auto generated emails; and identifying the status of the project during every stage.
Schedule Management
Prepare weekly client and management reports and automatically retrieve statistics, schedules and photos
Flexible in Budgeting By Stage Capturing CAPEX and OPEX
The budgets can be adjusted for each stage of the project (Concept, Preliminary Planning, Detailed Planning, Tendering, and Post Tendering). Cost calculation and control is comprehensive to capture both CAPEX and OPEX which include the cost of goods X-Factory, the cost of freight and customs independently, warranty cost, the cost of assets that are standard options as well as the cost of consumables and disposable.